Project:
Number Of Tanks: 1
Tank 1: 250,000 Gallon Elevated Water Tank
Owner: City Of Basile, LA
Engineer: Brad Rachel
__________________________________________________________________________________________
> REPLACE UNDERSIZED RISER MANWAY W/ 24" DIAMETER MANWAY
> ANGLE OVERFLOW PIPE AWAY FROM FOUNDATION AND ADD WEIGHTED FLAPPER GATE
> INSTALL CABLE TYPE LADDER SAFETY CLIMB DEVICE
> INSTALL LADDER GUARD (PREVENTS UNAUTHORIZED ACCESS)
> REPLACE ACCESS, WET, & RISER LADDERS WITH NON SKID RUNG LADDERS
> INSTALL SCREEN AND FLAPPER VALVE ON OVERFLOW
> INSTALL SWING GATE AT SHELL LADDER OPENING
> BLAST INTERIOR & EXTERIOR TO NEAR WHITE, SSPC-SP 10/NACE NO. 2 STANDARD
> INTERIOR COATING TO SPECIFICATIONS INCLUDING: PRIMER, SEAM TREATMENT, PIT FILLER, INTERMEDIATE, FINISH
> > EXTERIOR COATING TO SPECIFICATIONS INCLUDING: PRIMER, STRIPE COAT, FINISH1, FINISH 2, LOGO
> TANK WASH OUT, DISINFECTION, BACTERIOLOGICAL SAMPLING / CLEARANCE AND PLACING TANK BACK INTO SERVICE